📍 Goldman House, Great East Road, Lusaka, Zambia ✉️ info@prodrive.co.zm

01

Understand

Confirm the asset, complaint, operating context, urgency and expected outcome.

02

Inspect

Initial inspection, evidence collection and identification of safety-critical conditions.

03

Diagnose

Determine the likely failure mechanism; separate symptoms from root causes.

04

Propose

Clear scope, technical recommendations, parts, cost basis and estimated turnaround.

05

Execute

Approved work under controlled job allocation, proper tools and quality checks.

06

Verify

Test the repair or installation, confirm performance and record observations.

07

Handover

Explain work completed, parts used, limitations and next maintenance requirement.

08

Support

Monitor follow-up work, warranty issues and reliability actions where applicable.

Our Standards

Engineering & reliability practices

Diagnose first

Faults are properly diagnosed before parts are replaced.

Proper procedures

Manufacturer information, engineering specifications and accepted workshop procedures guide every repair.

Correct tools

Correct tools, measurements, torque settings, lubricants and assembly procedures are applied.

Safe isolation

Equipment is safely isolated, lifted, supported and tested during maintenance activities.

Verified handover

Major repairs and installations are reviewed and tested before handover.

Documented work

Work completed, parts used and recommended follow-up actions are properly recorded.